No. | Client | Project Description | Contract Duration |
1 | HIGHBASE STRATEGIC SDN BHD | Manpower Supply for welding & fitting works | 10 Months |
2 | BAYULINK SDN BHD | Man Power Supply For GTI Project | 7 Months |
3 | RIBUAN GAYA SDN BHD | Man Power Supply For Tembungo Project | 5 Months |
4 | SAPURA CREST PETROLEUM SDN BHD | Man Power Supply For Installation & Pipe Work of Hypoclorinator | 6 Months |
5 | CORRO-SHIELD SDN BHD | Man Power Supply For Removal & Installation Of Ball Valve AVV | 6 Months |
6 | SAPURA CREST PETROLEUM SDN BHD | Man Power Supply For Removal & Installation 8” Ball Valve | 4 Months |
7 | SHELL (SARAWAK SHELL BERHAD) | Man Power Supply For Scaffolding Installation | 8 Months |
8
| TALISMAN MALAYSIA LIMITED | Man Power Supply For Installation & Removal of Actuator Ball Valve | 6 Months |
9
| EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC. | Man Power Supply For Vessel Cleaning / Blasting & Internal Vessel | 8 Months |
10
| BLACK PEARL SDN BHD
| Man Power Supply For P-6760 Cassion Replacement – Offshore Execution | 14 Months |
11 | TMM ENGINEERING SERVICES SDN BHD | Man Power Supply For Up-Grading Facilities Launcher / Receiver Project | 6 Month |
12 | PENINSULAR OFFSHORE SDN BHD | Man Power Supply For Vessel Cleaning V5410 | 12 Month
|
No. | Client | Project Description | Contract Duration |
13 | SAPURA CREST SDN BHD | Manpower Supply for welding & fitting works | 5 Months |
14 | PACIFIC ADVANCE SDN BHD | Man Power Supply For Cosmetic & Touch Up Painting Work Samarang Platform | 6 Months |
15 | SHELL (SARAWAK SHELL BERHAD) | Man Power Supply For Water Maker Piping / Structure Installation | 10 Months |
16 | PFC ENGINEERING SDN BHD | Man Power Supply For Workshop Works | 4 Months |
17 | TMM SDN BHD | Man Power Supply For West Platform | 3 Months |
18 | TALISMAN MALAYSIA LIMITED | Man Power Supply For Hot Tapping Works | 6 Months |
19 | DELEUM PRIMERA SDN BHD | Man Power Supply For Blasting & Painting Works | 5 Months |
20
| PETRONAS CARIGALI SDN BHD | Man Power Supply For Blasting & Painting Works | 8 Months |
21
| INNOVATIVE OFFSHORE SOLUTIONS SDN BHD | Man Power Supply For Metering Skid Installation | 6 Months |
22
| TANJUNG OFFSHORE BERHAD | Man Power Supply For Removal & Installation of ABV | 9 Months |
23 | TRANSWATER API SDN BHD | Manpower & Materials Supply for Offshore Installation Works for Baram Platform
| 3 Month |
24 | TRANSWATER API SDN BHD | Manpower & Materials Supply for Offshore Installation Works for ERB WEST Platform
| 3 Month
|
25 | TRANSWATER API SDN BHD | Manpower Supply, Equipment, Tool & Consumable To Install 3 Unit 8″ x 1500 Abv Valve For Erb West B Platform
| 1 Month
|
26 | TRANSWATER API SDN BHD | Manpower & Installation For Fusible Plug Loop FPL At Bayan Platform
| 1 Month
|
27 | TRANSWATER API SDN BHD | Manpower Supply & Installation Of 3 Unit Valve At BIF Plant
| 1 Month
|