No.ClientProject DescriptionContract Duration
1HIGHBASE STRATEGIC SDN BHDManpower Supply for welding & fitting works10 Months
2BAYULINK SDN BHDMan Power Supply For GTI Project7 Months
3RIBUAN GAYA SDN BHDMan Power Supply For Tembungo Project5 Months
4SAPURA CREST PETROLEUM SDN BHDMan Power Supply For Installation & Pipe Work of Hypoclorinator6 Months
5CORRO-SHIELD SDN BHDMan Power Supply For Removal & Installation Of Ball Valve AVV6 Months
6SAPURA CREST PETROLEUM SDN BHDMan Power Supply  For Removal & Installation 8” Ball Valve4 Months
7SHELL (SARAWAK SHELL BERHAD)Man Power Supply For Scaffolding Installation8 Months
8

 

 

TALISMAN MALAYSIA LIMITEDMan Power Supply For Installation & Removal of Actuator Ball Valve6 Months
9

 

EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC.Man Power Supply For Vessel Cleaning / Blasting & Internal Vessel8 Months
10

 

BLACK PEARL SDN BHD

 

Man Power Supply For P-6760 Cassion Replacement – Offshore Execution14 Months
11TMM ENGINEERING SERVICES SDN BHDMan Power Supply For Up-Grading Facilities Launcher / Receiver Project6 Month
12PENINSULAR OFFSHORE SDN BHD Man Power Supply For Vessel Cleaning V541012 Month

 

 

No.ClientProject DescriptionContract Duration
13SAPURA CREST SDN BHDManpower Supply for welding & fitting works5 Months
14PACIFIC ADVANCE SDN BHDMan Power Supply For Cosmetic & Touch Up Painting Work Samarang Platform6 Months
15SHELL (SARAWAK SHELL BERHAD)Man Power Supply For Water Maker Piping / Structure Installation10 Months
16PFC ENGINEERING SDN BHDMan Power Supply For Workshop Works4 Months
17TMM SDN BHDMan Power Supply For West Platform3 Months
18TALISMAN MALAYSIA LIMITEDMan Power Supply For Hot Tapping Works6 Months
19DELEUM PRIMERA SDN BHDMan Power Supply For Blasting & Painting Works5 Months
20

 

PETRONAS CARIGALI SDN BHDMan Power Supply For Blasting & Painting Works8 Months
21

 

INNOVATIVE OFFSHORE SOLUTIONS SDN BHDMan Power Supply For Metering Skid Installation6 Months
22

 

TANJUNG OFFSHORE BERHADMan Power Supply For Removal & Installation of ABV9 Months
23TRANSWATER API

SDN BHD

Manpower & Materials Supply for Offshore Installation Works for Baram Platform

 

3 Month
24TRANSWATER API

SDN BHD

Manpower & Materials Supply for Offshore Installation Works for ERB WEST Platform

 

3 Month

 

 

25TRANSWATER API

SDN BHD

Manpower Supply, Equipment, Tool & Consumable To Install 3 Unit 8″ x 1500 Abv Valve For Erb West B Platform

 

1 Month

 

 

26TRANSWATER API

SDN BHD

Manpower & Installation For Fusible Plug Loop FPL At Bayan Platform

 

1 Month

 

 

27TRANSWATER API

SDN BHD

Manpower Supply & Installation Of 3 Unit Valve At BIF Plant

 

1 Month