No. Client Project Description Contract Duration
1 HIGHBASE STRATEGIC SDN BHD Manpower Supply for welding & fitting works 10 Months
2 BAYULINK SDN BHD Man Power Supply For GTI Project 7 Months
3 RIBUAN GAYA SDN BHD Man Power Supply For Tembungo Project 5 Months
4 SAPURA CREST PETROLEUM SDN BHD Man Power Supply For Installation & Pipe Work of Hypoclorinator 6 Months
5 CORRO-SHIELD SDN BHD Man Power Supply For Removal & Installation Of Ball Valve AVV 6 Months
6 SAPURA CREST PETROLEUM SDN BHD Man Power Supply  For Removal & Installation 8” Ball Valve 4 Months
7 SHELL (SARAWAK SHELL BERHAD) Man Power Supply For Scaffolding Installation 8 Months
8

 

 

TALISMAN MALAYSIA LIMITED Man Power Supply For Installation & Removal of Actuator Ball Valve 6 Months
9

 

EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC. Man Power Supply For Vessel Cleaning / Blasting & Internal Vessel 8 Months
10

 

BLACK PEARL SDN BHD

 

Man Power Supply For P-6760 Cassion Replacement – Offshore Execution 14 Months
11 TMM ENGINEERING SERVICES SDN BHD Man Power Supply For Up-Grading Facilities Launcher / Receiver Project 6 Month
12 PENINSULAR OFFSHORE SDN BHD Man Power Supply For Vessel Cleaning V5410 12 Month

 

 

No. Client Project Description Contract Duration
13 SAPURA CREST SDN BHD Manpower Supply for welding & fitting works 5 Months
14 PACIFIC ADVANCE SDN BHD Man Power Supply For Cosmetic & Touch Up Painting Work Samarang Platform 6 Months
15 SHELL (SARAWAK SHELL BERHAD) Man Power Supply For Water Maker Piping / Structure Installation 10 Months
16 PFC ENGINEERING SDN BHD Man Power Supply For Workshop Works 4 Months
17 TMM SDN BHD Man Power Supply For West Platform 3 Months
18 TALISMAN MALAYSIA LIMITED Man Power Supply For Hot Tapping Works 6 Months
19 DELEUM PRIMERA SDN BHD Man Power Supply For Blasting & Painting Works 5 Months
20

 

PETRONAS CARIGALI SDN BHD Man Power Supply For Blasting & Painting Works 8 Months
21

 

INNOVATIVE OFFSHORE SOLUTIONS SDN BHD Man Power Supply For Metering Skid Installation 6 Months
22

 

TANJUNG OFFSHORE BERHAD Man Power Supply For Removal & Installation of ABV 9 Months
23 TRANSWATER API

SDN BHD

Manpower & Materials Supply for Offshore Installation Works for Baram Platform

 

3 Month
24 TRANSWATER API

SDN BHD

Manpower & Materials Supply for Offshore Installation Works for ERB WEST Platform

 

3 Month

 

 

25 TRANSWATER API

SDN BHD

Manpower Supply, Equipment, Tool & Consumable To Install 3 Unit 8″ x 1500 Abv Valve For Erb West B Platform

 

1 Month

 

 

26 TRANSWATER API

SDN BHD

Manpower & Installation For Fusible Plug Loop FPL At Bayan Platform

 

1 Month

 

 

27 TRANSWATER API

SDN BHD

Manpower Supply & Installation Of 3 Unit Valve At BIF Plant

 

1 Month